RESPONSIBILITIES
A detailed plot plan, drainage plan and blueprints must be attached to and submitted with the building permit application.
In the case of water and wastewater hookups, application will be made prior to construction/moving. The hookup fee is $350 for a single-family dwelling. The Superintendent of Works must be present to inspect the installation and notified at the time of connection to service lines. The City will provide a ¾” water meter. Property owners are responsible for any repairs from the shut off to the home. The City retains ownership of water meters and has the right of inspection to assure compliance.
An excavation permit is necessary when excavation is necessary within city streets or public ways. The fee is $500. Upon inspection, the City will reimburse up to $475 after excavation is completed and the site filled, compacted, leveled to its original condition.
Building permits expire after 120 days, after which time reapplication will be made.
|
|
|
|